I know how to do the time format but my question is from the value that is calculated, how do i show it in time format? (the calculation will save time
)
Again from the first example, if the building costs 100 credits, and the construction time is 50 credits per hour, then the building will take 2 hours to build (which will show 02:00:00) or if the building cost is 50 credits, and the construction time is 100 credits, then the building will take 1/2 hour to build (00:30:00)
Well perhaps I'm thinking more of Stopwatch time than the normal time
Again from the first example, if the building costs 100 credits, and the construction time is 50 credits per hour, then the building will take 2 hours to build (which will show 02:00:00) or if the building cost is 50 credits, and the construction time is 100 credits, then the building will take 1/2 hour to build (00:30:00)
Well perhaps I'm thinking more of Stopwatch time than the normal time